spill-550

SPCC Plans

GEEC has an experienced staff that can provide turn-key Spill Prevention, Control and Countermeasures Plan.  An SPCC plan must be prepared by all facilities subject to regulation. This plan is to help prevent any discharge of oil into navigable waters or adjoining shorelines. The main thrust of the SPCC regulation is prevention as opposed to after-the-fact reactive measures commonly described in Oil Spill Contingency Plans.

GEEC personnel have completed over 250 Spill Prevention, Control and Countermeasure Plans and Pollution Prevention Plans including the following:

 

Waskey Bridge, Inc.  – Baton Rouge Facility*

Port of Greater Baton Rouge – Baton Rouge Dock

TransMontaigne Terminaling – Multiple Facilities across United States

Schlumberger – 3 South Louisiana Facilities.

Petroleum Fuel & Terminal – Baton Rouge Dock Facilities

Formosa Plastics Corp.- Baton Rouge La

Shin-tech- Plaquemine, LA

 

* GEEC personnel provided on-site Spill Prevention, Control and Countermeasure training for facility employees.

 

GEEC personnel have completed over 55 Volume Surveys for  Oil and Gas Terminal for facility compliance with DOT and SPCC regulations for on-site storage and tank design.  Facilities were located in Kentucky, Georgia, North Carolina, South Carolina, Texas, and Mississippi.